NSA.gov5

The Utah Data Center is powered by the Cray XC30 supercomputer, which is capable of workloads of more than 100,000 trillion calculations per second.

Total storage capacity is estimated between 3-12 exabytes.

The 1M square-foot data center cost roughly $1.5B-$2B to construct.

The facility, at full capacity, is expected to use 1.7M gallons of water per day